Hi Lemmy,

I want to do a project that involves concrete. Basically I am making steps, giving them texture and stamping them so it looks somewhat like stones.

I have watched a million videos and I feel I can tackle this, plus I have a lot of areas to practice that won’t be too visible so if the steps look a bit amateur it’s fine.

My biggest question is about the effort of mixing concrete. I have a corded drill with a mixing paddle and most steps won’t require much. However a few are larger and I would have to mix 10 bags or so. The drying time allows me to work one at a time and then do my stamping but I was wondering if this is feasible from an effort perspective.

I am an experienced DIYer but have not worked much with concrete, I made a coffee table, post bases, etc but never something that requires so many bags… am I setting myself up for failure / a broken back? hehehe