This is an automated archive made by the Lemmit Bot.
The original was posted on /r/framework by /u/GlaucoL on 2023-09-06 13:48:27.
Sorry for the stupid question but cannot seem to find the answer and want to wait for first reviews before committing.
I’m tempted by the Ryzen 7 13 since I’ll be in need of a new laptop in the next few months. I can pre-order now on batch 6 and only see batch 7 after that. After these 2 batches are sold out would they keep producing or if I miss on it that’s it and have to wait for next gen?
Thanks and sorry if this has been asked before.
You must log in or register to comment.